Use eRedbook,cementingtables, log viewers, and more to assist with daily operations.
[email protected]A digital toolkit for engineering calculations eRedBook software is a digital version of a portion of the original RedBook cementing tables. eRedBook software is compatible with Windows® 7 and is offered by Halliburton as a free download containing calculators (such as balanced plugs), Interactive wellbore schematics, and data from the American Petroleum Institute (API).
DetailsEvery well has unique formation, temperature, and pressure properties along with other variable such as annuli trajectory and diameter that can affect fluid movement duringcementingoperations and thecementsheath. Taking into account such variables,Halliburtondesignscementing jobswith a slurry design intended to mix easily on location, stay fluid until the job is complete, and then quickly set, …
DetailsHalliburtonrecognizes that wellbore construction is integral to well performance and total recovery. As a result,Halliburtonhas developed proprietary applied-design tools to enable the design of acement sheathfor two distinctively different steps: the last step in drilling each section of the wellbore, and the first important step in completions.
DetailsSqueezecementing, sometimes referred to as remedialcementing, is the process of using pump pressure to inject or squeezecementinto a problematic void space at a desired location in the well. Squeezecementingoperations may be performed at any time during the life of the well: drilling, completions or producing phases.
DetailsCEMENTING CALCULATIONS. Slurry Volume. The slurry volume =cementvolume, gal+ water volume, gal+ additive volume, gal. Yield ofCement. Y = yield of slurry = (slurry volume gal /7.48) ft 3 /sack.CementSlurry Requirements. Number of sacks ofcement= slurry volume, cu.ft / yield ofcement, cu.ft/sack. Mix Water Requirement
DetailsApr 19, 2019· Volumetric calculations to place a balanced cement plug can be easily done based on the well schematic, pipe’s dimensions, open hole and casing sizes and the final cement plug length. See next images for an example calculation.
DetailsCement plugsare used for various reasons, including. Solving a lost-circulationproblemduring drilling operations by spotting acement plugacross the thief zone and then drilling back through the plug; Plugging a zone or abandonment of a well by sealing off selected intervals, a dry hole or a depleted well;
Detailsx = 15.11b of hematite per sk ofcementused.Calculationsfor the Number of Sacks ofCementRequired. If the number of feet to becementedis known, use the following: Step 1. Determine the following capacities: a) Annular capacity, ft3/ft: y J 183.35. b) Casing capacity, ft3/ft: c) Casing capacity, bbl/ft: Casing capacity, bbl/ft =-Step 2
Detailsx = 15.11b of hematite per sk ofcementused.Calculationsfor the Number of Sacks ofCementRequired. If the number of feet to be cemented is known, use the following: Step 1. Determine the following capacities: a) Annular capacity, ft3/ft: y J 183.35. b) Casing capacity, ft3/ft: c) Casing capacity, bbl/ft: Casing capacity, bbl/ft =-Step 2
DetailsCementing Calculations • Solution: – Yield of cement= 1.18 cu.ft/sk (Halliburton) –Cementvolume • Annular Capacity = .1745 cu ft/ft (Halliburton) • Annular Vol = .1754 cuft/ft X 2000’ = 349 cu ft • Casing Capacity = .2210 cu ft/ft • Casing Volume = .2210 X 80 = 17.68 cu. ft. •Cementvolume = 349 + 17.68 cu. Ft = 366.68 cu. ft.
DetailsCementing and Grouting Calculations.CementingInformation Water Requirements: Absolute Volumes: Cal-Seal/W-60: 4.8 gal/100 lbs
DetailsSep 20, 2010· Summary This chapter contains sections titled:CementSlurry Requirements Yield ofCementSlurry Density Hydrostatic Pressure Reduction Contact Time Gas Migration Potential (GMP)CementPlugCementing- Formulas andCalculationsfor Drilling Operations -Wiley Online Library
DetailsMar 02, 2017· For example, if you want a 6-gallon per sack mix, the weight of thecementper gallons should be 15 pounds per gallon. There is a formula for figuring it out.Halliburton CementingTables, known to many in the industry as theHalliburtonRed Book, has information on it. The book is not easy to find in print anymore, but it is accessible on the ...
DetailsJan 20, 2017· Filed Under: General, PrimaryCementingTagged With:cement calculations,cementvolumecalculation, primarycementingArticle Posted By: Lenin Diaz is an oil industry specialist with 24 years of technical and operational expertise in fluids,cementing, water control and shut-off.
DetailsThis freeconcrete calculatorestimates the amount ofconcretenecessary for a project, and can account for different shapes and amounts ofconcrete. Explore other calculators related to housing or building, as well as hundreds of other calculators addressing finance, math, fitness, health, and more.
DetailsLearns how to develop thecementdesign that meet customer requirements andHalliburton's commercial expectations followingHalliburtonManagement System procedures and usingHalliburtonsimulation software. Learns to determine lab testing requirements and testing conditions, job preparation, and interpreting well site data for post job analysis.
DetailsSep 21, 2018·Water Cement Ratio Calcis a fast and easy way tocalculatewatercementratio without all of the long hand written processes. If you are a QC/QA/VT this app will come in handy for giving you quick results while working in a fast pace environment. This app has the added benefit of being able to addcement, fly ash, slag, and silica fume to yourcalculation.
DetailsFor more than 75 years, the RedBook®cementingtables have been a part ofHalliburton's legacy and the industry preferred printed technical reference. Today,Halliburtonis setting a new industry standard for digital technical tools with the evolution of the eRedBook digital oilfield toolkit, an electronic version that goes beyond what has ...
DetailsThe water spacer ahead is also considered to be in open hole/tubing stringer annulus (i.e. one size of annulus). If more than one annulus exists then thecalculationswill have to be adjusted. (a) Quantity ofcementand mixwater required Vc = Cap0H x Length of plug (b) Thickening time and compressive strength SeeHalliburton CementingTables
DetailsA quick reference for day-to-day work out on the rig or a handy study guide for drilling and well control certification courses, Formulas andCalculationsfor Drilling, Production andWorkoverhas served a generation of oilfield professionals throughout their careers. Compact and readable, Formulas andCalculationsfor Drilling, Production andWorkover, 3rd Edition is a problem solving time ...
Details